repos

PLAN.md: mark Phase 31 deployed (d53651e)

5f4c8b81 by Isaac Bythewood · 1 month ago

modified PLAN.md
@@ -32,14 +32,12 @@ and resume cleanly from this file alone, keeping token use low._Last updated: 2026-05-23_**Current phase: Phase 31 (full UI polish pass) complete and verifiedlocally 2026-05-23; not yet deployed.** Driven by the user's"really do a full pass" steer. The Paper Ledger look is preserved; theplumbing under it now provides hierarchy, rhythm, and aligned mobile +desktop layouts. See the Phase 31 Done entry for the full list of changes.**Last deployed to production: Phase 15 (industry trends), 2026-05-23(commit `6043657`).** Yahoo**Current phase: Phase 31 (full UI polish pass) complete, verified,and deployed to production 2026-05-23 (commit `d53651e`).** Driven bythe user's "really do a full pass" steer. The Paper Ledger look ispreserved; the plumbing under it now provides hierarchy, rhythm, andaligned mobile + desktop layouts. See the Phase 31 Done entry for thefull list of changes. Yahoo`quoteSummary.assetProfile` is the source(clean GICS-style names); migration `0012` adds`symbols.asset_profile_synced_at` (the long-existing-but-unpopulated
@@ -174,8 +172,8 @@ backlog as Phase 19. The `watchlists` / `watchlist_items` tables stay in theschema, unused for now.**Done**- **Phase 31 full UI polish pass.** Complete and verified locally  2026-05-23. The Paper Ledger look stays; what changes is the design- **Phase 31 full UI polish pass.** Complete, verified, and deployed  to production 2026-05-23 (commit `d53651e`). The Paper Ledger look stays; what changes is the design  plumbing under it. Touches every page; no schema change, no new  network calls, no new endpoint guard.  - **Design tokens (base.scss).** Added a fluid type scale
@@ -1863,10 +1861,11 @@ depend on Phase 5 (live quotes) and Phase 7 (SEC data).  fund category were dropped (not in SEC structured data — user decision).  Commodity grantor trusts (GLD, SLV) get a minimal AUM-only profile.- [x] **Phase 31: Full UI polish pass.** Complete and verified locally  2026-05-23. See the Phase 31 entry in the Done list above and the  decisions log for the full set of changes. (Captured 2026-05-23 from  the user's "really do a full pass on the entire UI" steer.)- [x] **Phase 31: Full UI polish pass.** Complete, verified, and  deployed to production 2026-05-23 (commit `d53651e`). See the Phase 31  entry in the Done list above and the decisions log for the full set of  changes. (Captured 2026-05-23 from the user's "really do a full pass on  the entire UI" steer.)  Paper Ledger stays — what changes is the plumbing under it so the same  visual vocabulary reads cleaner, skims faster, and aligns on phone and  desktop. Audit-driven; the findings below are the work.